VARIANCE, CONDITIONAL USE, AND REZONING
APPLICANTS
There is no guarantee when applying for a Variance, Conditional
Use, or Rezoning Permit!
All
applications for a Variance, Conditional Use, or Rezoning permit
must be accompanied with two
(2)
checks, one issued
to
Aitkin County Zoning for $600.00, and one issued to
the
Aitkin County Recorder
for $46.00.
The
required fees are
VARIANCE= $600; CONDITIONAL USE= $600; REZONING= $600.
This
fee does not include any building permit fees and is
non-refundable if denied!!
The items below are also
required by the Aitkin County Zoning Office.
APPLICANT MUST
SUBMIT ELEVEN
(11)
COPIES OF ALL MATERIALS LISTED BELOW.
IF THESE ITEMS ARE NOT RECEIVED YOUR APPLICATION WILL
NOT BE PROCESSED.
THE PLANNING & ZONING DEPARTMENT WILL NOT MAKE COPIES FOR
THE APPLICANT!
PUD’S AND SUBDIVISIONS REQUIRE 15 COPIES OF ALL MATERIALS.
1.
Supplemental Data Sheet – All sections are to be
completed.
(11
copies)
2.
A signed and completed Zoning Permit Application. (DO
NOT NEED 11 COPIES OF ZONING PERMIT APPLICATION)
3.
A SCALED DRAWING (1”=20’).
The drawing should show
your lot dimensions, structure sizes and locations including
neighboring structures, septic tank and drainfield locations and
the date of installation (if known), location and depth of all
wells within 100 feet of the property; setback distances to lot
lines, road right-of-ways, the ordinary high water level of
lakes or rivers.
The drawing should also
indicate any unique topographical features of the property
(wetlands, bluffs, etc.), that may affect the variance or
conditional use permit.
Please include a north directional arrow.
If a larger scale is
needed to show all information, obtain prior approval from the
Zoning Office!
(11
copies)
**
A REGISTERD SURVEY MAY BE REQUIRED TO VERIFY THE ACCURACY OF THE
SUBMITTED INFORMATION BEFORE GRANTING OF THE VARIANCE. **
***Registered surveys are required if road or property line
setbacks are not met***(11
copies)
4.
A certificate of compliance may be required on the
Individual Sewage Treatment System if adequate records are not
available and if the Planning and Zoning Office is unable to
determine if the system is in compliance per Minnesota State
Rules Chapter 7080 and Aitkin County Ordinance.
(11
copies)
5.
A copy of your deed must also be submitted with your
application. (You may obtain one at the Recorder’s office
218-927-7336).
(11
copies)
6.
The property must be completely staked including all
corners of your lot, all corners of the proposed structure(s)
and the septic system location and the 911 address at the end of
the driveway.
7.
Specific
directions to your property must be submitted with your
application. The
911 address must be staked at the end of the driveway.
It is the
applicant’s responsibility to provide accurate directions to the
property.
Failure to submit
accurate directions could result in the tabling of the
application until a later date!
(11
copies)
8.
Shoreland Performance Standards and Erosion Control
Plan-mandatory! The
Soil and Water Conservation District may be contacted for this
at 218-927-6565 or our office can help you fill it out.
(11 copies)
Submittal
of the above materials does not always constitute a complete
application.
Other
information may be
necessary to complete the application based on the type of
request and onsite inspection.
You will receive notice of the meeting date; please plan to
attend or have a representative attend this meeting. |